Click these links:
Home
About PAC
Services
Systems
Products
Articles
News
Specifications
Testimonials
Español
Contact Us
Dealership


|

| 
| 
|
SYSTEMS
ARENA AND MULTI PURPOSE SPORTS FACILITIES
|
|

|

|

|
Peter Albrecht Company, Inc. does the job right!
Hallmarks of our expertise in the arena of lifting systems include:
- An unblemished safety record spanning 90 years.
- Production capabilities for systems with 50,000 pound lift capacity.
- Custom-designed systems for your application.
- Factory trained personnel who install or supervise the installation of every PAC lifting system.
Some other completed projects:
RCA (Hoosier) Dome, Indianapolis, IN
UNI-Dome, University of Northern Iowa, Cedar Falls
Beard-Eaves Coliseum, Auburn University, Alabama
Casper Events Center, Wyoming
Target Center, Minneapolis, MN
Brigades Center, U.S. Naval Academy, Annapolis
NBA Production Facility, Meadowlands, Secaucus, NJ
Poliedro de Caracas, Venezuela
|
|
University of WI, Kohl Center, Madison
Texas Tech, United Spirit Arena, Lubbock TX
Scoreboard Hoist, United Spirit Arena
|
 |

|
A self-climbing speaker cluster hoist. The speaker cluster frame, suspended from the roof, is raised and lowered by the hoist mounted on the frame. Total weight being lifted is 23,000 lbs. at a speed of 10 fpm, travel is 125 feet.
|
|
The divider curtain system at the RCA (Hoosier) Dome allows the arena to be partitioned into smaller areas for various sporting events as well as conventions. The curtain is suspended from a catenary cable suspended from two 10,000 lb. hoists. When not in use, the suspension cables can be stored away at roof level.
| 
|
 |
click here for more
Scoreboard Hoist Control Systems |
| |